Before signing a preliminary sale agreement, have the house inspected on eight points: structure, roof and waterproofing, damp, electrics, plumbing, drainage, joinery and administrative compliance. The first seven are a job for a building technician, the last one for the notary and the municipality. A defect spotted before signing can be used to negotiate the price or to walk away; discovered afterwards, it is yours to pay for.
The checklist in one table
| Trade | What is checked | Warning sign |
|---|---|---|
| Structure | Cracks, columns, beams, floors, plumbness of walls | Stepped or diagonal crack, crack wider than 2 mm, exposed and rusty steel |
| Flat roof | Waterproofing, upstands, slopes, outlets, expansion joints | Stains on the top-floor ceiling, persistent puddles, upstands coming loose |
| Damp | Base of walls, bathrooms, below-ground walls, ventilation | Efflorescence, swelling plaster, musty smell, fresh paint in one spot |
| Electrics | Consumer unit, 30 mA RCDs, earthing, cable sizes | Pin fuses, no RCD, unprotected wires, sockets without earth |
| Plumbing | Pressure, pipe materials, water heater, meter | Corroded galvanised steel pipes, meter turning with taps closed |
| Drainage | Connection to sewer or septic tank, inspection chambers, slopes | Odours, blocked chambers, tank with no known plan or maintenance |
| Joinery | Windows, doors, guardrails, glazing | Rotten wood, warped frames, guardrail too low or unstable |
| Administrative | Land title, building permit, occupancy permit, plans | Built area different from the plans, floor added without authorisation |
The technical trades: where to look
- Structure: walk around the outside, then through each room. Fine vertical cracks in render are often superficial; those that go through the wall, widen or start from the corners of openings deserve an engineer's opinion. Our article on cracks and how serious they are explains how to read them.
- Roof and waterproofing: go up onto the roof terrace. In Morocco, most houses have a flat roof; waterproofing more than 10 to 15 years old and cracked upstands mean it will need redoing.
- Damp: a moisture meter and a torch are enough for an initial check. Be wary of a room repainted just before the sale.
- Electrics: open the consumer unit. An installation with no 30 mA residual current device and no earth connection needs to be redone, whatever the apparent condition of the sockets.
- Plumbing and drainage: turn on all the taps at once, flush the toilets, watch how the water drains and read the meter before and after the viewing.
- Joinery: operate every window and door; in Marrakech, single glazing and leaky frames weigh heavily on the air-conditioning bill.
The administrative side
Ask the seller for the land title and obtain a recent certificate of ownership from the land registry (ANCFCC): it shows the registered owner, mortgages and objections. The title proves ownership, not that the building is compliant: also ask for the building permit, the approved plans and the occupancy permit (permis d'habiter) provided for by Law 12-90 on urban planning, then compare the plans with what has actually been built.
Bringing in an engineering firm
A structural engineer and a building services technician can spot in one visit what a buyer cannot see: an undersized column, a sagging floor, a dangerous electrical installation. The report prices the work trade by trade and gives you an objective argument to negotiate. For ballpark figures, see our article on the cost of a building inspection. SIGMA ICC carries out these pre-purchase visits in Marrakech and the surrounding region, with a trade-by-trade report and photos.
Frequently asked questions
What should you check before buying a house in Morocco?
Eight trades: structure, flat roof and waterproofing, damp, electrics, plumbing, drainage, joinery, and administrative compliance (land title, building permit and occupancy permit).
Is the land title enough to make the purchase safe?
No. The ANCFCC certificate of ownership proves who owns the property and lists mortgages, but it says nothing about whether the building is compliant: you also need the building permit, the approved plans and the occupancy permit.
When should the technical inspection be done?
Before signing the preliminary agreement or promise of sale, so that you can negotiate the price or walk away if the report reveals significant defects.
A project in the pipeline?
SIGMA ICC designs reinforced concrete, electrical, plumbing and HVAC systems and supervises sites for villas, riads, hotels and shops.
Sources : ReaConsult, vérifier un titre foncier au Maroc · Bladi, consulter le dossier foncier d'un bien · ReaConsult, expertise avant ou après compromis.