Concrete mix ratios: foundations, slabs, columns and blinding

How much cement per m³ depending on the element, what goes into a cubic metre of concrete, and the site mistakes that rob concrete of its strength.

Published 16 November 2026 · 5 min read · SIGMA ICC, engineering consultancy

Concrete is the most widely used material on Moroccan building sites, and also the one most often mixed "by eye". Concrete that is too lean in cement or has too much water added loses a large part of its strength. Here are the usual mix ratios, to be confirmed against the concrete class set by your engineering firm in its drawings.

Usual mix ratios by element

ElementCement per m³ of concrete
Blinding concrete (under the footings)150 to 200 kg
Reinforced concrete foundations, footings, tie beams350 kg
Reinforced concrete columns, beams, walls, slabs350 kg
Ground slabs, screeds to falls, non-structural elements250 to 300 kg

What goes into one cubic metre at 350 kg

  • Cement: 350 kg, i.e. 7 bags of 50 kg.
  • Sand: about 400 litres.
  • Gravel (fine gravel): about 800 litres.
  • Water: about 175 litres, to be adjusted according to the moisture of the sand.

These are common site proportions; on a properly organised project, the engineering firm specifies a strength class (for example C25/30) and a batching plant supplies a designed and tested concrete.

Mistakes that weaken concrete

  • Adding water to make placing easier: this is the leading cause of weak, porous concrete.
  • Not vibrating: voids around the reinforcement encourage corrosion.
  • Pouring without inspecting the reinforcement: insufficient cover, forgotten spacers, displaced bars.
  • Neglecting curing: in hot weather, as is often the case in Marrakech, the concrete must be kept moist for several days (watering, sheeting) so that it does not dry too quickly and crack.
  • Striking formwork too early on slabs and beams, before the concrete has gained enough strength.

Ready-mix or site-mixed concrete?

For slabs and large volumes, ready-mixed concrete (from a batching plant) guarantees a consistent composition and quick placing. Site-mixed concrete remains common for small volumes, provided the mix ratios are respected and it is not "stretched" with water.

Frequently asked questions

What concrete mix for a foundation?

For reinforced concrete foundations (footings, tie beams), the usual mix is 350 kg of cement per m³; the blinding concrete placed underneath is mixed at 150 to 200 kg.

How many bags of cement for 1 m³ of concrete?

For concrete at 350 kg/m³, you need 7 bags of 50 kg of cement, with about 400 litres of sand, 800 litres of gravel and 175 litres of water.

What mix for a reinforced concrete slab?

A reinforced concrete slab is generally mixed at 350 kg of cement per m³, depending on the concrete class set by the engineering firm.

A project in the pipeline?

SIGMA ICC designs reinforced concrete, electrical, plumbing and HVAC systems and supervises sites for villas, riads, hotels and shops.

Can we help you?

Click to call, or write to us: we answer 7 days a week for emergencies.

Chat on WhatsApp