Adding a floor is often cheaper than buying a new plot. But a house was not designed to carry an extra storey: before any project, two things must be checked, what planning rules allow and what the structure can bear.

1. What planning rules allow

The development plan sets, for each zone, the permitted height and number of storeys. A planning information note states what is allowed on your plot. In a co-owned building, the co-owners' agreement is also required. Adding a storey requires, like a new construction, a building permit filed with an architect's plans and technical studies.

2. What the structure can carry

This is the decisive question, and it cannot be settled "by eye": starter bars sticking out of the roof do not prove that a floor is possible. The engineering firm checks:

  • The foundations: their dimensions and the bearing capacity of the soil, sometimes with a soil study and trial pits at the foot of the footings.
  • The columns and beams: sections, reinforcement, condition of the concrete (a core sample or a reinforcement survey may be necessary).
  • The roof slab, which will become a floor and will have to carry new loads.
  • The seismic behaviour of the whole building, since an extra storey increases the forces in an earthquake.

3. Solutions if the structure is not enough

  • Strengthen the columns (reinforced concrete or composite jacketing).
  • Rework or widen the foundations (underpinning).
  • Lighten the new floor: steel or timber structure, lightweight partitions.

The engineering firm's assessment prices these options and helps decide whether adding a storey is still worthwhile.

The steps

  1. Planning information note and architect's sketch design.
  2. Assessment of the existing structure by the engineering firm.
  3. Strengthening and new-floor studies, then filing of the permit.
  4. Strengthening works, then construction of the floor, with inspection of the reinforcement.

Frequently asked questions

Do you need a permit to add a floor in Morocco?

Yes: adding a storey requires a building permit, with an architect's plans and technical studies, and it must comply with the development plan.

Can my house carry an extra floor?

Only a structural assessment by an engineering firm can tell: foundations, columns, beams and slab must be checked.

What if the structure is not enough?

The columns and foundations can be strengthened, or the new floor lightened (steel structure, lightweight partitions), depending on the assessment.

A project in the pipeline?

SIGMA ICC designs reinforced concrete, electrical, plumbing and HVAC systems and supervises sites for villas, riads, hotels and shops.

Sources : Bati.ma, surélévation de maison au Maroc · Guatbi Immo, surélever au Maroc · Francobat, permis de construire au Maroc.

Can we help you?

Click to call, or write to us: we answer 7 days a week for emergencies.

Chat on WhatsApp