Handover of a new off-plan (VEFA) flat: how to record snags

On the day you get the keys, anything you do not note in the handover report may be considered accepted. Here is how to prepare the inspection and write up your snags.

Published 16 November 2026 · 4 min read · SIGMA ICC, engineering consultancy

When a flat bought off-plan is handed over, you must inspect it room by room and record every visible defect in the handover report as precise reservations, dated and signed by the developer. A visible defect not noted that day will be hard to get fixed afterwards. Take your time, compare with the specification attached to the contract and, if possible, bring someone with you.

The framework: off-plan sales (VEFA) in Morocco

Sales of property under construction are governed by Law 44-00, incorporated into the Code of Obligations and Contracts (Articles 618-1 et seq.), and amended and supplemented by Law 107-12. These texts require in particular a contract drawn up in authenticated form or by an authorised professional, an attached technical specification, a delivery date and payment in instalments according to progress, as well as a completion or refund guarantee provided by the developer. In practice, several press articles note that these rules are unevenly applied: read your contract and have your notary check it.

Preparing the handover visit

  • Bring the contract and the specification: type of floor and wall finishes, fittings, windows and doors, planned air conditioning.
  • Bring a tape measure, a spirit level, a torch, a small socket tester and your phone to photograph each defect.
  • Ask for the water and electricity to be switched on: without them, it is impossible to test the plumbing and circuits.
  • Come in daylight and allow at least two hours for a family flat.

The handover checklist

ItemWhat to check
Areas and plansRooms match the sales plan, ceiling height, floor area
Walls and ceilingsCracks, flatness, paint finish, signs of damp
FloorsBroken or hollow-sounding tiles, grout, skirting, slope towards floor drains
Windows and doorsOpening, closing, seals, scratched glazing, shutters, front door lock
ElectricsConsumer unit with 30 mA RCDs, labelling, every socket and light point working
PlumbingPressure, hot water, drainage, leaks under sinks, sanitary ware securely fixed
Air conditioning, ventilationEquipment as per the specification, condensate drainage, ventilation vents
Ancillary areasBalcony, terrace, guardrails, storage room, parking space, letterbox

Writing useful reservations

A reservation should allow the contractor to find the defect without you: room, location, nature of the defect. Write "bedroom 2, wall on the window side: 40 cm horizontal crack" rather than "crack in bedroom". Attach the photos, keep a signed copy and agree in writing on a deadline for clearing the reservations. For defects that appear after handover, report them in writing without delay. Our article on acceptance of works and reservations covers this point in more detail.

After handover, serious defects affecting the soundness of the building fall under the builders' ten-year liability provided for by the Code of Obligations and Contracts (Article 769), and ten-year insurance became compulsory for construction projects at the end of 2024. See our article on the ten-year guarantee in Morocco.

Getting support

A building engineer sees in one visit what a layperson cannot: a non-compliant consumer unit, a shower floor sloping the wrong way, a structural crack. SIGMA ICC accompanies buyers at handover and helps them draw up the list of reservations.

Frequently asked questions

Which law governs buying off-plan in Morocco?

Law 44-00 on the sale of property under construction, incorporated into the Code of Obligations and Contracts and amended and supplemented by Law 107-12.

What happens if I sign the handover report without reservations?

Visible defects that are not mentioned may be considered accepted, making it difficult to get them fixed. Note every visible defect, with photos.

Can I attend the handover with an expert?

Yes, nothing prevents you from being accompanied by a building professional; it is recommended in order to spot technical defects and write precise reservations.

A project in the pipeline?

SIGMA ICC designs reinforced concrete, electrical, plumbing and HVAC systems and supervises sites for villas, riads, hotels and shops.

Sources : ReaConsult, VEFA au Maroc : garanties et risques · TelQuel, loi sur la vente sur plans : ce qui change · ReaConsult, réception d'un logement neuf et réserves · Médias24, assurance construction obligatoire.

Can we help you?

Click to call, or write to us: we answer 7 days a week for emergencies.

Chat on WhatsApp