There is no single depth for all networks: it depends on the type of network, the location (roadway, pavement, garden) and the operator's requirements. As an indication, a cover of 0.80 to 1 m is often used for drinking water, 0.60 to 0.85 m for low-voltage electrical cables depending on whether they run under a pavement or a roadway, and for sewerage a depth dictated by the gradients, often the greatest.
Indicative depths
| Network | Usual depth | Warning mesh colour |
|---|---|---|
| Drinking water | 0.80 to 1 m | Blue |
| Electricity (LV, lighting) | 0.60 to 0.85 m (deeper under a roadway) | Red |
| Telecommunications | Depending on the operator, often in ducts at shallow depth | Green |
| Sewerage and stormwater | Set by the gradients and the level of the sewer | Brown |
| Gas | Depending on the operator | Yellow |
These values come from road regulations and professional guides; the specifications of Moroccan distributors may set other minimums. Under a roadway, the cover must at least exceed the thickness of the pavement structure.
Proper laying
- Sand bedding about ten centimetres thick at the bottom of the trench, free of stones.
- Surround of the pipe or duct in sand or fine material.
- Warning mesh in the network's colour, laid about 20 to 30 cm above the pipe.
- Backfill compacted in layers, especially under a future road.
- Position survey (as-built drawings) before closing.
Distances between networks
Networks must not be laid in contact with each other: minimum clearances are respected, horizontally and vertically (French standard NF P 98-332 is often used as a reference). Drinking water runs above sewerage to avoid any risk of contamination, and electrical cables are kept away from water pipes and telecoms. In a shared trench, each network has its defined place on a typical cross-section.
Trench safety
A trench collapse can bury a worker in a few seconds. In France, the Labour Code requires trenches deeper than 1.30 m whose width is less than or equal to two thirds of their depth to be shored, propped or battered, and a clear berm to be left at the edge of the excavation. These benchmarks are good practice to apply on any site, particularly in sandy or disturbed soils.
The role of the engineering firm
The VRD engineering firm draws the trench cross-sections, coordinates the networks with each other and with the road pavement, checks each operator's requirements and insists on accurate as-built drawings at the end of the works: they are what will prevent a cable from being cut during future works. See also the VRD steps for a subdivision.
Frequently asked questions
At what depth should a water pipe be buried?
A cover of 0.80 to 1 m is commonly used for drinking water, more under a roadway; the network operator may impose its own minimums.
At what height should the warning mesh be laid?
About 20 to 30 cm above the pipe or cable, in the network's colour: blue for water, red for electricity, green for telecoms, brown for sewerage.
When must a trench be shored?
In France, beyond 1.30 m deep when the width is less than or equal to two thirds of the depth; it is good practice to follow on any site.
A project in the pipeline?
SIGMA ICC designs reinforced concrete, electrical, plumbing and HVAC systems and supervises sites for villas, riads, hotels and shops.
Sources : Ville de Beausoleil, notice d'exécution des travaux de voirie · Futura, règles de pose de l'électricité enterrée · Code du travail (France), article R4534-24 · Travail-Industrie, couleurs des réseaux (AIPR).