No article matches. See all topics.
Subdivision VRD in Morocco: the steps from design to acceptance
Roads, sewerage, water, electricity, lighting, telecoms: the logical order of studies and works for a subdivision, and what determines when plots can be sold.
Read the article →
Combined or separate sewer system: differences and choice in Morocco
One pipe for everything or two separate networks: what the choice between a combined and a separate sewer system changes, for a subdivision as for a villa.
Read the article →
Water and electricity connection in Marrakech: from Radeema to SRM
Who to contact, which documents to prepare and which mistakes to avoid to obtain drinking water, sewer and electricity connections for a villa or a building.
Read the article →
Wastewater lifting station: when to install one and how
When the public sewer is higher than your drains, gravity is no longer enough: here is how a lifting station works and how to design it properly.
Read the article →
Road pavement structure: layers, thicknesses and mistakes to avoid
A road that deforms after two winters almost always has a defect beneath the asphalt. Here is how a pavement is built and what needs to be checked.
Read the article →
Street lighting for a subdivision: levels, poles, LED and network
How many lux in a residential street, which lamp posts, how to supply the network: the benchmarks for designing the street lighting of a subdivision.
Read the article →
Site drainage and stormwater: solutions for your house
In Marrakech, it rains little but hard: a few storms are enough to flood a basement or a swimming pool. Here is how to manage rainwater on a plot.
Read the article →
Trenches and underground networks: depths, warning mesh, distances
At what depth to lay water, electricity, telecoms and sewerage, how to mark them and how to prevent a trench from becoming dangerous.
Read the article →Need a study for your project?
SIGMA ICC carries out engineering studies and site supervision in Marrakech and across Morocco.