For a villa or a small building on reasonable soil, footings (pad footings under the columns, strip footings under the walls) connected by tie beams remain the most common and most economical solution. A raft becomes worthwhile when the soil is weak or heterogeneous, and piles when the good soil lies too deep. The soil investigation decides, then the structural engineer does the design.
The three main families
| Foundation | Principle | Typical case |
|---|---|---|
| Pad and strip footings | Shallow foundation: each column or wall rests on a widened reinforced concrete footing | Bearing soil at shallow depth, moderate loads (villa with one or two upper floors) |
| Raft foundation | Thick reinforced concrete slab under the whole footprint, which spreads the loads | Low-bearing soil, risk of differential settlement, basement with groundwater |
| Piles or micropiles | Deep foundation that reaches a strong soil at depth | Thick fill, compressible soil, heavy loads, underpinning |
What the soil investigation must give you
The geotechnical report provides the data that drive the choice:
- The allowable bearing pressure of the soil (in bars or MPa) and the depth at which it is reached.
- The settlement risks, in particular differential settlement between two parts of the building, which causes many cracks.
- The presence of water (water table, seepage), swelling clays, fill or cavities.
- A recommended foundation type and founding level.
Without this information, the engineer has to make cautious assumptions, which often costs more in concrete and steel than the investigation itself. See our article on the cost of a soil investigation in Morocco.
When to switch from footings to a raft?
When the calculated footings become so large that they almost touch, or would cover a large part of the building footprint, a raft often becomes simpler and not necessarily more expensive. A raft is also preferred when differential settlement must be limited or a watertight basement is required. Conversely, on good soil, a raft under a light villa is generally oversized.
Seismic requirements
In Morocco, the seismic code RPS 2000 (2011 version) also applies to foundations: pad footings must be tied together by tie beams so that they do not move relative to one another during an earthquake. A single building block should in principle rest on a single foundation type and at a consistent level, unless justified. To learn more, see our article on the RPS 2011 seismic code.
The role of the engineering firm
The engineering firm combines the soil report, the building load take-down and the RPS requirements to choose the foundation and produce its formwork and reinforcement drawings. On site, it checks that the bottom of the excavation matches the soil described by the geotechnical engineer before the blinding concrete is poured: this is when a bad surprise costs the least.
Frequently asked questions
Which foundation for a two-storey villa in Morocco?
On soil with good bearing capacity, pad footings under columns and strip footings under walls, connected by tie beams, are generally sufficient. The final choice depends on the soil investigation and the engineer's calculations.
Is a raft stronger than footings?
Not necessarily: a raft suits weak soils or basements, but on good soil properly designed footings are just as safe and more economical.
When are piles needed?
When the strong soil lies too deep for shallow foundations, for example under thick fill or compressible soils. The geotechnical investigation determines this.
A project in the pipeline?
SIGMA ICC designs reinforced concrete, electrical, plumbing and HVAC systems and supervises sites for villas, riads, hotels and shops.
Sources : École des Ponts, cours fondations superficielles · Techniques de l'Ingénieur, fondations profondes.