Cover is the distance between the concrete surface and the nearest reinforcement, stirrups included. The values depend on the exposure of the structure: with the BAEL 91, still widely used in Morocco, the values are 1 cm inside closed, dry premises, 3 cm for surfaces exposed to the weather or condensation, and 5 cm in marine or highly aggressive environments. With Eurocode 2, the nominal cover is generally between 25 and 45 mm depending on the exposure class.
Why cover is vital
Concrete naturally protects steel from corrosion thanks to its alkalinity. Over time, carbon dioxide from the air penetrates the concrete (carbonation) and eventually reaches the reinforcement if the cover is too thin. The steel rusts, swells and makes the concrete burst: this is the classic defect of balconies, parapets and façade columns that spall. Cover also ensures the bond between steel and concrete and provides protection in case of fire.
Reference values
| Situation | BAEL 91 (art. A.7.1) | Eurocode 2 (indicative, class S4) |
|---|---|---|
| Dry interior, closed premises | 1 cm | ≈ 25 mm (XC1) |
| Exterior, weather, condensation | 3 cm (2 cm if concrete > 40 MPa) | ≈ 35 to 40 mm (XC3, XC4) |
| Marine or highly aggressive environment | 5 cm | ≈ 45 mm and more (XS) |
| Concrete cast against the ground | Increased value | 40 mm on blinding concrete, 75 mm against bare soil |
With Eurocode 2, the nominal cover equals the minimum cover plus a construction tolerance, generally 10 mm. The exact values depend on the structural class, the concrete class and the national annex applied: they are set by the engineer on the drawings. The diameter of the largest bar is also a minimum.
How to guarantee cover on site
- Spacers in concrete or plastic, of the right thickness, in sufficient numbers (not pieces of brick or stone).
- Chairs for the top mesh of slabs, so that it is not crushed under the workers' feet.
- Clean and stable formwork, so that the reinforcement does not move during pouring.
- Proper vibration, without touching the reinforcement, to avoid honeycombing.
The Marrakech climate
High temperatures and dry air speed up the drying of surface concrete, which becomes more porous if curing is neglected: the protection provided by the cover decreases. Proper concrete curing is therefore the essential complement to correct cover. Swimming pools, buried structures and tanks deserve higher values.
The role of the engineering firm
The engineering firm specifies the cover of each element on the drawings and checks it during the reinforcement inspection before pouring. Insufficient cover is one of the most frequent defects found, and one of the most expensive to repair later.
Frequently asked questions
What cover for an exterior column?
Under BAEL 91, 3 cm for a surface exposed to the weather; under Eurocode 2, about 35 to 40 mm depending on the exposure class. The exact value is shown on the engineer's drawings.
What cover for a foundation footing?
Concrete cast against the ground requires increased cover: Eurocode 2, for example, uses 40 mm on blinding concrete and 75 mm directly against the soil.
What happens if the cover is insufficient?
The reinforcement eventually rusts, swells and makes the concrete burst: this is the origin of much spalling on balconies, parapets and façade columns.
A project in the pipeline?
SIGMA ICC designs reinforced concrete, electrical, plumbing and HVAC systems and supervises sites for villas, riads, hotels and shops.
Sources : AFGC, détermination de l'enrobage des armatures · LCPC, guide technique sur l'enrobage · AQC, corrosion des armatures en façade.