Occupancy permit and certificate of conformity in Morocco: procedure

Without an occupancy permit, a new house cannot be legally occupied, permanently connected to utilities or sold with peace of mind. Here is how to obtain it without unpleasant surprises.

Published 16 November 2026 · 3 min read · SIGMA ICC, engineering consultancy

The occupancy permit (permis d'habiter, for a dwelling) or the certificate of conformity (for a building not intended for housing) is issued by the president of the municipal council once the works are completed. It certifies that the building as constructed matches the building permit granted. It is the document that closes the process opened by Law 12-90 on urban planning and by the general building regulation (Decree No. 2-18-577 of 2019).

What is it actually for?

  • Legally occupying the building and using it for its authorised purpose.
  • Obtaining permanent water and electricity connections from the distributor (Radeema in Marrakech, ONEE, Lydec, Redal or Amendis depending on the city).
  • Updating the land title and selling or mortgaging the property: notaries and banks systematically ask for it.

The steps of the application

  1. Full completion of the works: the Ministry of the Interior has asked municipalities to stop issuing partial occupancy permits; the building must be finished in its entirety.
  2. Architect's certificate of completion of works: the architect who supervised the site certifies that the building complies with the authorised plans. The architect assumes liability and will not sign if there are discrepancies.
  3. Submission of the application on the Rokhas platform, with the documents required by the municipality (architect's certificate, plans, network documents as applicable).
  4. As-built inspection visit by a commission that compares the building with the plans: footprint, height, number of storeys, floor areas, façades, setbacks.
  5. Issuance of the occupancy permit or certificate of conformity, or notification of the non-conformities to be corrected.

The most common reasons for refusal

Discrepancy foundConsequence
Additional storey or room on the roof terraceRefusal; demolition or regularisation to be studied
Setbacks or height not respectedRefusal, sometimes an infringement report
Façade or openings modifiedAmended permit often required
Unfinished works (renders, guardrails, surroundings)Application postponed until completion

Any change during construction must therefore be approved by the architect and, if it affects what was authorised, be covered by an amended permit before it is built. Non-compliant buildings also fall under the infringement control regime established by Law 66-12.

Our tips to save time

Prepare the application during the finishing works rather than afterwards: gather the authorised plans, any amended permit, the contractors' certificates and the network documents. Ask the architect for a pre-handover visit to spot discrepancies that can still be corrected. Also check the often-forgotten surroundings: boundary wall, pavement, connection inspection chambers, terrace guardrails. Finally, do not let occupants move in before the permit is issued: in the event of an inspection or a claim, the lack of an occupancy permit puts you in a difficult position, particularly with regard to your insurer.

The role of the engineering consultancy

The technical engineering consultancy (BET) works upstream: its structural and network drawings are the ones the contractor builds from. Its site supervision and visit reports provide the record that the building was constructed according to the rules, which makes the architect's certificate easier to obtain. For the previous phase, see our article on the building permit via Rokhas and the one on site supervision by the BET.

Frequently asked questions

Who issues the occupancy permit in Morocco?

The president of the municipal council, after full completion of the works and a visit by the commission that checks compliance with the building permit.

Can a partial occupancy permit be obtained?

No: the Ministry of the Interior has asked municipalities to issue the occupancy permit or certificate of conformity only after the building is fully completed.

What is the difference between an occupancy permit and a certificate of conformity?

The occupancy permit concerns residential buildings; the certificate of conformity concerns other uses (retail, offices, hotels…). Both certify compliance with the permit.

A project in the pipeline?

SIGMA ICC designs reinforced concrete, electrical, plumbing and HVAC systems and supervises sites for villas, riads, hotels and shops.

Sources : Hespress, fin des permis d'habiter partiels · Finances News, permis d'habiter et certificat de conformité · Rea Consult, certificat de conformité.