Percentage of works or fixed fee, what makes the price vary, what a serious quote must contain: everything you need to budget the technical studies for your project.

Published 16 November 2026 · 6 min read · SIGMA ICC, engineering consultancy

It is often a client's first question: how much will the technical studies cost? The answer depends on the project, but there are orders of magnitude, and above all points to check when comparing quotes that do not all cover the same thing.

Orders of magnitude

Basis of calculationOrder of magnitude
Structural studies (reinforced concrete), as a percentage of the cost of worksabout 1 to 3%
All technical studies for a standard villa (structure, electrical, plumbing, HVAC)about 30,000 to 100,000 DH
Luxury villa or more technical programmemore, depending on the trades and site supervision

These ranges, taken from several guides to the Moroccan market, are indicative: only a quote based on your plans is binding.

What makes the price vary

  • The trades studied: reinforced concrete only, or also electrical (power and low-current systems), plumbing, air conditioning and ventilation, fire safety.
  • The complexity of the structure: basement, long spans, cantilevers, swimming pool, sloping plot, higher seismic zone.
  • Site supervision: number of visits, inspection of reinforcement before each pour, handover.
  • Deliverables: detailed construction drawings, bills of quantities and specifications for tendering to contractors.

How to compare two quotes

  1. Check that the same trades are included: a "reinforced concrete only" quote cannot be compared with an all-trades quote.
  2. See whether site supervision is included, and how many visits.
  3. Ask whether bills of quantities and the cost estimate are provided: they are used to negotiate with contractors.
  4. Be wary of very low prices: a structure calculated too quickly is paid for in unnecessary concrete and steel, or in remedial work.

An item that saves money

An optimised structure uses less concrete and steel than one oversized "by eye"; a well-designed electrical network avoids cutting new chases in finished walls. On a villa, these savings often cover a good part of the study fees.

Frequently asked questions

How much does an engineering firm cost for a villa in Morocco?

For all the technical studies of a standard villa, generally allow between 30,000 and 100,000 DH; structural studies alone often represent 1 to 3% of the cost of works.

Is site supervision included in the BET's price?

Not always: check the number of visits and the inspection of reinforcement before pouring on the quote.

Why are engineering firms' quotes so different?

Because they do not cover the same trades, the same level of detail or the same site supervision: compare them line by line.

A project in the pipeline?

SIGMA ICC designs reinforced concrete, electrical, plumbing and HVAC systems and supervises sites for villas, riads, hotels and shops.

Sources : Bati.ma, honoraires architecte et études · Archiplan, coût de la construction au Maroc 2026 · Construire à Marrakech, coût d'une villa.